KEYS!

Just to prove it here is a pic of the keys and garage remote. The keys are for the window, sliding door, front and rear door handles, and front and rear door mortice locks. Once the screens are installed there will be one more key to carry around.

Also they provided 4 remotes as there are two doors with separate mechanisms and each came with a spare. Awesome.


Tiling for the floors will be done on Saturday, thanks Lockwood, and they will let that set on Sunday and finish off by installing the carpet on Monday.

I am hoping to have the valuation inspection done Tuesday or Wednesday so that the remaining loan can be released and then I can organise the concreting, fencing and landscaping.

The security fence is still up but will be gone next week.

Friday, August 27, 2010

8 weeks to go!

Two days late, but it's only two months to go! (That's with me ignoring the one week extension I reckon they will not need)

I went out last night and think it was just the front and the outside wall of the garage left half done to go. The eaves have also started. Going out this weekend so I hope to post pictures showing this later.

Funny thing is all this time I've been coming and going and now they have locked the gate. What they don't know is I have my ways... if they still exist that is, haha! Mostly the unlocked gates makes me cranky because of people dumping rubbish, and in fact I don't know why other sites have one of those special bins but mine doesn't so there is just this growing pile in the front yard.

Got a water bill this week too, but the hide of them - when I went there last night a hose was running. So will raise this with the ever silent SS2 when I can corner him.

8 weeks to go! YAY!!!

Thursday, July 8, 2010

Underground Plumbing Connections 08-07-10

Despite some mid-morning drizzle the plumbing connections appear to have gone ahead on schedule.



There has also been the appearance of the some formwork, the security fence and the beloved trademen's friend, the port-a-loo! The middle picture below is looking across the front window of the main lounge towards the portico. In the third picture can you see the pile of dirt? I can't believe we had one like that hauled away already and now there is the same again. A friend of a friend building nearby said that because the dirt wasn't carted away immediately neighbouring lots dumped their excess on his pile, and then he was quoted $17,000 to cart it away. He argued with the builder and the developer and not sure of the details of the arrangement reached but it was agreed that as it was the result of dumping he wouldn't be charged above the excess. Apparently the lesson to observe from this is if the builder hasn't agreed to remove it immediately go and take some pictures of the size and shape, or if it is not covered in the contract arrange to have it taken away ASAP and again take pictures.



I start a new job on the 19th so my random late afternoon trips will stop but hopefully by then the frame will be going up, then the guttering, and the bricking or roofing commenced thereafter, so the new visual changes will be less frequent and weekend trips should suffice. The slab will be laid on Monday/Tuesday coming, then some more plumbing and then usually the frame goes up about the end of the following week.

The picture below and left is of the garage looking towards the main lounge and back. Once it is done the builder provides 3 steps from the garage into the house. I still have no real sense of what the final height will be, but it makes me confident that at least the same will be needed in the front yard up to the portico.

The second picture is looking from the right hand side across the backyard. It is 4m deep to the back fence, but that narrowing is caused by the rainwater tank. The shed will also be positioned on the rear wall as it has no windows looking out, ad otherwise Camden Council guidelines are that sheds must be positioned 900m off the boundary, so really encroaching too much. It's only going to be a narrow under eaves version with a sliding door just big enough to make sure the mower and the like don't have to be stored in the garage. But as you can see they have excavated so much at what appears to be about 1m from the rear fenceline so I am inclined to retain it at this point and garden behind it. The entertainment area is around the corner to the left, and because the house is set 2m from the Peach Palace I am guessing that the dog will have a grass patch to do her business around there somewhere near the garage, adjacent to the car washing bay Camden Council requires you to have in the front yard.


my greenhill slideshow

It's the Brown roof in the middle