Saturday, December 18, 2010

Concreting done!

So with everything in place they contacted the bottom half of the house... well not really, just plastic to protect everything.


The finish product out front is the half/half plain concrete and swirled coloured section. A long time ago I was told this is how Camden Council wants it, and recently found out that it's their policy in case they do works out front all the will do is lay plain concrete, so it's up to you if you want to foot the bill to have the whole thing re-sprayed as the new and old will always look different.


Out the back is a lighter colour with a 10" tile effect. This is when only part of the pattern was removed.


The side has a pad for the shed which will sit under the eaves.


And a laundry step so we can get in and out now!


The formwork was done previously and they came back today at 6.30am and had the job done by 2pm.

No comments:

Post a Comment

my greenhill slideshow

It's the Brown roof in the middle