Wednesday, October 20, 2010

House pre-clean and PCI today

On Monday I went out and these are the pics I took:

The port-a-loo is gone and all outdoor painting is complete.


The pile of rubbish was still there, and in the top right you see the free microwave.


The outside drains have covers.


And this is the mains earthing with warning tag that some idiot painted brown so I had to get close to read it...


and the meter box inside.


Today was PCI and everything looks good.

The rubbish is gone but the fences will come down before handover of the keys.


This is the ensuite, which I normally take photos of from outside.


This is the internal main toilet. A solar tube will be installed because as you can see it is fairly dark in there without the light on. I have opted for the internal light fixture for the tube, so the bayonet wiring will be re-routed to a light fitted inside the tube and this will reduce the number of the holes in the ceiling and reduce the clutter.


This is one smoke detector with the dust cover on. The back-up batteries need to be replaced annually.


And the alarm panel near the front door still has its protective cover on.


Annually the termi-mesh must be inspected as part of a regular pest inspection, this can be through any provider but it must be logged on a sticker inside the meter box to keep the warranty up for insurance. Also the water filter in the kitchen must be replaced and the filter in the water tank cleaned. The SS advised to put it in the calendar, same time each year and do it all on the one weekend.

But because MB made contact with the bank too late the valuation inspection was conducted in the afternoon after the PCI and the payment won't be issued until that report goes in.

Looks like handover will be the middle of next week.

No comments:

Post a Comment