Saturday, October 16, 2010

Paint and Powerpoints!

Well the house is coming together, hopefully in time to be handed over on Wednesday. The panel above the roller doors has been painted.


The front door has been painted and the mortice lock installed. Inside the painting of the walls, ceilings, trims and doors has been finished and the door handles are on. The powerpoints and light fittings are in.


The meter box has been painted, although it has a dusty handprint on it.


The eaves and downpipes have been painted. The security alarm and the hot water system installed.


And the rainwater tap sign has been put up.


I met the other neighbour today, and saw that the people in Number 15 have moved in. So it looks like I'm going to be the fourth household moved in.

No comments:

Post a Comment

my greenhill slideshow

It's the Brown roof in the middle